Timesheets are associated with 1 week, with a specific date range. Timesheets are also related to Stories and Tasks. Stories are part a date range as well:
1) A Story is part of a Sprint, and a Sprint has a Start Date and End Date
2) A Story is part of a Project, and the Project has a planed begin and end dates.
We enforce those dates manually now, so if your Timesheet shows a Story that is not supposed to be part of the dates on the Timesheet we revert those hours. Same in regards to projects. After a Project Ends, we don't allow someone to track time in a Timesheet that is outside the date range for the project.
Instead of doing these corrections manually, we would like the Timesheet to enforce the respective date ranges for Stories and Projects.
Lastly, Deleted Tasks. We don't allow a Timesheet to be Submitted or approved with time tracked on a Deleted Task. We again enforce this manually through running reports, but would like for this to be part of the Timesheet integrity checks.
by: Steven C. | 8 days ago | Tracking