Dear Team,

(ASIS:) As per the current settings one could add multiple tasks to 1 phase with the same naming, and this may raise significant systematic ambiguity.

(TOBE:) Please, make sure that a particular phase could contain only maximum 1 task with a specific name. If it is not possible (for various possible reasons), then please make sure that the editor throws at least a warning with the content: that it is not recommended to use unnecessary ambiguity.

Thanks and regards,

Peter

Comments

  • Thank you for the idea. We will monitor the upvotes of the broader use base.